Arcadian II Seawall Cathodic Protection

March 27, 2024

Location

Myrtle Beach, SC

Period

1974 - Present

Contractor/Engineer

Stone Restoration of America

Arcadian II Condominium

Arcadian II Condominium, located on the ocean in Myrtle Beach, SC, already had experience with PatchGuard anodes when they performed balcony repairs. When their seawall needed restoration, they wanted to ensure that the repairs would last and the structure would be in good health for many years to come. 

The engineer of record specified a PatchGuard Connect and AMP-UP RB to protect the reinforcing from the harsh coastal environment. 

PatchGuard Connect Anodes were installed along the seawall cap during the restoration project. AMP-UP RB was applied to the reinforcing in the seawall in order to protect the steel further and increase the efficiency of the cathodic protection system. 

The CP system was designed by Durability, Inc. and installed by Stone Restoration of America. 

Additional Case Studies

Happy Customers Corbett & Chelsea Simon

Residential Structures

NDLFC Shipping Container

NDLFC Shipping Container

Corrosion of steel shipping container

AMP-UP™ 100 Self-Healing Primer, AMP-UP™ Urethane

Learn More
Learn More about NDLFC Shipping Container
Benjamin Franklin Bridge

Bridges & Tunnels

Benjamin Franklin Bridge

Benjamin Franklin Bridge

Corrosion of reinforced concrete elements

Camur III, CASSETTE™ ICCP

Learn More
Learn More about Benjamin Franklin Bridge
Miami Freedom Tower, Miami, FL

Commercial

Miami Freedom Tower

Miami Freedom Tower

Corrosion of reinforced concrete elements

Camur III, CASSETTE™ ICCP, PatchGuard Connect Galvanic Anodes, ZEBRA Conductive Paint ICCP

Learn More
Learn More about Miami Freedom Tower