Casa Costa

March 27, 2024

Location

Boynton Beach, FL

Period

2009 - Present

Contractor/Engineer

Restore Construction

Casa Costa Boynton Beach, FL

Casa Costa started a concrete restoration project, including on a support beam in the parking garage. Once excavation started, the engineer noticed that the beam was badly corroded and contained a large amount of reinforcement. Upon discovering the site conditions, the engineer contacted NoCo to provide a corrosion protection solution for the beam. 

NoCo worked with the engineer to provide a solution that would protect both the steel inside the substrate conrete (not excavated) and the steel within the new patch repair. PatchGuard Connect anodes were installed intot he substrate concrete, along with AMP-UP RB to provide a physical barrier on the surface of the steel. 

Additional Case Studies

Happy Customers Corbett & Chelsea Simon

Residential Structures

NDLFC Shipping Container

NDLFC Shipping Container

Corrosion of steel shipping container

AMP-UP™ 100 Self-Healing Primer, AMP-UP™ Urethane

Learn More
Learn More about NDLFC Shipping Container
Benjamin Franklin Bridge

Bridges & Tunnels

Benjamin Franklin Bridge

Benjamin Franklin Bridge

Corrosion of reinforced concrete elements

Camur III, CASSETTE™ ICCP

Learn More
Learn More about Benjamin Franklin Bridge
Miami Freedom Tower, Miami, FL

Commercial

Miami Freedom Tower

Miami Freedom Tower

Corrosion of reinforced concrete elements

Camur III, CASSETTE™ ICCP, PatchGuard Connect Galvanic Anodes, ZEBRA Conductive Paint ICCP

Learn More
Learn More about Miami Freedom Tower