Miami Courthouse

March 27, 2024

Location

Miami, FL

Period

1928 - Present

Contractor/Engineer

Structural B/R

Miami Courthouse

The Miami Courthouse was undergoing a concrete restoration project. Large columns located in the basement of the building were due to be excavated and coated using a cementitous corrosion inhibitor. 

As the columns are below the water table, the basement would flood unless pumps were used to keep water out for extended periods of time. This was causing scheduling and profitbaility issues for the installing contractor as the work was taking too long and the pumps were expensive to rent. Upon discovering AMP-UP RB's fast drying time, the contractor submitted for a product switch from the cementitous corrosion inhibitor, to AMP-UP RB. 

NoCo submitted technical data to the engineer of record and AMP-UP RB was approved for use on the columns. This afforded the contractor to only rent the water pumps for installation and drying time of AMP-UP RB, a considerably shorter time period than with the previous product they were using. As a result, the column coating was completed quicker and pumps could be returned sooner, increasing both efficiency and profitability on the job. 

Additional Case Studies

Happy Customers Corbett & Chelsea Simon

Residential Structures

NDLFC Shipping Container

NDLFC Shipping Container

Corrosion of steel shipping container

AMP-UP™ 100 Self-Healing Primer, AMP-UP™ Urethane

Learn More
Learn More about NDLFC Shipping Container
Benjamin Franklin Bridge

Bridges & Tunnels

Benjamin Franklin Bridge

Benjamin Franklin Bridge

Corrosion of reinforced concrete elements

Camur III, CASSETTE™ ICCP

Learn More
Learn More about Benjamin Franklin Bridge
Miami Freedom Tower, Miami, FL

Commercial

Miami Freedom Tower

Miami Freedom Tower

Corrosion of reinforced concrete elements

Camur III, CASSETTE™ ICCP, PatchGuard Connect Galvanic Anodes, ZEBRA Conductive Paint ICCP

Learn More
Learn More about Miami Freedom Tower