Miami Courthouse

The Miami Courthouse was undergoing a concrete restoration project. Large columns located in the basement of the building were due to be excavated and coated using a cementitous corrosion inhibitor. 

As the columns are below the water table, the basement would flood unless pumps were used to keep water out for extended periods of time. This was causing scheduling and profitbaility issues for the installing contractor as the work was taking too long and the pumps were expensive to rent. Upon discovering AMP-UP RB's fast drying time, the contractor submitted for a product switch from the cementitous corrosion inhibitor, to AMP-UP RB. 

NoCo submitted technical data to the engineer of record and AMP-UP RB was approved for use on the columns. This afforded the contractor to only rent the water pumps for installation and drying time of AMP-UP RB, a considerably shorter time period than with the previous product they were using. As a result, the column coating was completed quicker and pumps could be returned sooner, increasing both efficiency and profitability on the job. 

Additional Case Studies

Dania Beach Casino, Dania Beach FL

Commercial

Dania Beach Casino

Dania Beach Casino

Corrosion & paint failure of structural steel

AMP-UP™ 100 Self-Healing Primer

Learn More
Learn More about Dania Beach Casino
Casa Costa Boynton Beach, FL

Residential Structures

Casa Costa

Casa Costa

Corrosion of support beam

AMP-UP RB, PatchGuard Connect Galvanic Anodes

Learn More
Learn More about Casa Costa
Sloan's Curve Condominium

Residential Structures

Sloan's Curve Condominium

Sloan's Curve

Corrosion of sprinkler pipes and coating failure

AMP-UP™ 100 Self-Healing Primer

Learn More